YTS
YTS · OPS COMMAND
LIVE
Houston Time
Sat, May 09, 2026
12:21:04 AMCDT
IBD
All Facilities
Operational Report
79
Health
SDH-3 · Southeast US

SE Distribution Hub

Distribution STABLE
Throughput
59kbbl/d
14-Day Downtime Risk
29%
Active Work Orders
6
Open Incidents
1
RBI Inspections Due
2
Total Assets
204
Last Inspection
Mar 2026
Status
WARNING

Asset Telemetry — Live Feed

TagTypeVibrationTempPressureFailure ProbStatus
V-502Vessel0.8 mm/s44°C12 bar5%NORMAL

Open Work Orders

  • WO-8891
    V-502 Vessel · RBI Inspection
    HIGH
    Due May 08

Mechanical Integrity / RBI

  • C-204
    Last Mar 2026 · Next OVERDUE
    RBI 8.7
    ACTION REQUIRED
  • SEP-7A
    Last Jan 2026 · Next May 2026
    RBI 6.2
    DUE SOON
  • E-112
    Last Feb 2026 · Next Aug 2026
    RBI 4.1
    CURRENT
  • P-118
    Last Apr 2026 · Next Oct 2026
    RBI 2.3
    CURRENT

AI Operational Intelligence — Recent Signals

  • HIGHPREDICTIVE · 84% conf · 4m ago

    Compressor C-204 vibration trend at TX-4 indicates elevated mechanical degradation probability — failure window: 8–12 days

    model: Vibration Anomaly Detector v2.1
  • MEDIUMLOGISTICS · 91% conf · 7m ago

    Red Sea corridor delay risk increased 18% — 3 inbound chemical shipments affected, ETA revision probable

    model: Logistics Risk Engine v1.3
  • HIGHANOMALY · 77% conf · 11m ago

    Offshore Rig 7 pressure anomaly detected on separator train — deviation 2.3σ above baseline

    model: Process Anomaly Detector v1.7
  • MEDIUMWEATHER · 88% conf · 14m ago

    Gulf Coast tropical system tracking indicates 73% probability of logistics disruption within 96 hours

    model: Met Risk Model v2.0

Switch Facility

Need a deeper walkthrough?

Discuss this facility's signals, integrations, or pilot scope with the architect.

View Details →