All Facilities
Operational Report
61
Health
OR-7 · Gulf of Mexico
Offshore Rig 7
Drilling Rig DOWN
Throughput
31kbbl/d
14-Day Downtime Risk
67%
Active Work Orders
18
Open Incidents
3
RBI Inspections Due
5
Total Assets
142
Last Inspection
Jan 2026
Status
CRITICAL
Asset Telemetry — Live Feed
| Tag | Type | Vibration | Temp | Pressure | Failure Prob | Status |
|---|---|---|---|---|---|---|
| SEP-7A | Separator | 5.2 mm/s | 71°C | 67 bar | 61% | WARNING |
Open Work Orders
- WO-8799SEP-7A Separator · InspectionHIGHDue May 09
- WO-8845SEP-7A Separator · MOC ReviewMEDIUMDue May 15
Mechanical Integrity / RBI
- SEP-7ALast Jan 2026 · Next May 2026RBI 6.2DUE SOON
AI Operational Intelligence — Recent Signals
- HIGHPREDICTIVE · 84% conf · 4m ago
Compressor C-204 vibration trend at TX-4 indicates elevated mechanical degradation probability — failure window: 8–12 days
model: Vibration Anomaly Detector v2.1 - MEDIUMLOGISTICS · 91% conf · 7m ago
Red Sea corridor delay risk increased 18% — 3 inbound chemical shipments affected, ETA revision probable
model: Logistics Risk Engine v1.3 - HIGHANOMALY · 77% conf · 11m ago
Offshore Rig 7 pressure anomaly detected on separator train — deviation 2.3σ above baseline
model: Process Anomaly Detector v1.7 - MEDIUMWEATHER · 88% conf · 14m ago
Gulf Coast tropical system tracking indicates 73% probability of logistics disruption within 96 hours
model: Met Risk Model v2.0
Switch Facility
Need a deeper walkthrough?
Discuss this facility's signals, integrations, or pilot scope with the architect.
