All Facilities
Operational Report
88
Health
LAT-2 · Louisiana
Louisiana Terminal
Terminal UP
Throughput
94kbbl/d
14-Day Downtime Risk
18%
Active Work Orders
7
Open Incidents
0
RBI Inspections Due
1
Total Assets
156
Last Inspection
Apr 2026
Status
HEALTHY
Asset Telemetry — Live Feed
| Tag | Type | Vibration | Temp | Pressure | Failure Prob | Status |
|---|---|---|---|---|---|---|
| E-112 | Heat Exchanger | 1.4 mm/s | 88°C | 31 bar | 28% | WARNING |
Open Work Orders
- WO-8823E-112 Heat Exchanger · CorrectiveMEDIUMDue May 11
Mechanical Integrity / RBI
- E-112Last Feb 2026 · Next Aug 2026RBI 4.1CURRENT
AI Operational Intelligence — Recent Signals
- HIGHPREDICTIVE · 84% conf · 4m ago
Compressor C-204 vibration trend at TX-4 indicates elevated mechanical degradation probability — failure window: 8–12 days
model: Vibration Anomaly Detector v2.1 - MEDIUMLOGISTICS · 91% conf · 7m ago
Red Sea corridor delay risk increased 18% — 3 inbound chemical shipments affected, ETA revision probable
model: Logistics Risk Engine v1.3 - HIGHANOMALY · 77% conf · 11m ago
Offshore Rig 7 pressure anomaly detected on separator train — deviation 2.3σ above baseline
model: Process Anomaly Detector v1.7 - MEDIUMWEATHER · 88% conf · 14m ago
Gulf Coast tropical system tracking indicates 73% probability of logistics disruption within 96 hours
model: Met Risk Model v2.0
Switch Facility
Need a deeper walkthrough?
Discuss this facility's signals, integrations, or pilot scope with the architect.
